Page 6 of 6 FirstFirst ... 456
Results 51 to 52 of 52
  1. #51
    Senior Dog
    Join Date
    May 2014
    Location
    Las Vegas
    Posts
    1,550
    Thanked: 840
    Dang Betty, you can have a house built in Vegas within 3 months. Just sayin.
    Ok, get the spider out and the dimples and waves, welllllll that sounds like my...... Never mind.

    your doing good and don't let em get away with anything.

  2. The Following User Says Thank You to Dallas dawg For This Useful Post:

    bett (07-06-2014)

  3. #52
    Senior Dog
    Join Date
    May 2014
    Location
    baldwin, ny 11519
    Posts
    1,073
    Thanked: 928
    ok, so he left his bucket and some mixing tool.

    just went down and checked and except for one spot where it looks like a piece of cement fell from somewhere and landed on the wet floor, pretty good. i will text him today, as he's in sag harbor working, that his bucket and stirrer are here and i have to show him one tiny spot. or maybe i'll just ask him to call me and tell him it looks good. or he will leave me with the bucket, the stirring tool and cement. i will live with it if i have to, covering perhaps with a rug.

    I've had enough of the floor already. and all in all, it's ok. or better than ok.

 



Not a Member of the Labrador Retriever Chat Forums Yet?
Register for Free and Share Your Labrador Retriever Photos

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •